CMM/CMMI Development Timeline

1979 - Quality Management Maturity Grid Philip Crosby, "Quality is Free"

1985 - IBM Maturity Grid
R.A. Radice, J.T. Harding, et al, "A Programming Process Study", IBM Systems Journal, Vol. 24, No.2, 1985.

1987 - Maturity Questionnaire
W.S. Humphrey, "Characterizing the Software Process: A Maturity Framework", Software Engineering Institute, CMU/SEI-87-TR-11, DTIC Number ADA182895, June 1987.
W.S. Humphrey and W.L. Sweet, "A Method for Assessing the Software Engineering Capability of Contractors", Software Engineering Institute, CMU/SEI-87-TR-23, DTIC Number ADA187320, September 1987.

1989 - Capability Maturity Model
Watts Humphrey, "Managing the Software Process", Addison-Wesley, Reading, MA, 1989.

1991 - SW-CMM, v1.0

1993 - SW-CMM, v1.1

2002 - CMMI, v1.1

2006 - CMMI, v1.2

2010 - CMMI, v1.3

20XX - CMMI Next Gen

No comments:

Post a Comment